Monday, April 12, 2010

El Cerrito Community Newsletter, April 2010

CONTENTS:
  • April Meeting: All about Gardening And Water Conservation
  • March's Community Meeting
  • Greetings and Farewell for the ECCC Board of Directors
  • A word of Gratitude to a Resident of El Cerrito
  • Update: El Cerrito Neighborhood Patrol
  • Sewer And Water Upgrades
  • Newsletter Donations
  • You Can Help Support the ECCC
  • College Neighborhoods Home Tour Featuring El Cerrito
  • Boo Parade Update
  • Spring Business Mixer
  • Edible Gardens of Rolando And How You Can Have One Too
  • What Is Scavenging and How I can Report It

To read the April Newsletter, select the following link:
El Cerrito Community Newsletter, April 2010

To view local business advertisements, select the following links:
First page of local business ads
Second page of local business ads

Changing The Guard


Mrs. Peacock and her late husband moved into a house on Berting Street more than 40 years ago. During much of that time, Mr. Peacock served as Block Captain for their neighborhood, and since his death, she has taken over that responsibility. At the March 18 ECCC community meeting, Mrs. Peacock gave up her position as Block Captain, pinning her late husband’s Block Captain name tag on Maurize Rios. The image shows (from left) Maurize Rios, Mrs. Peacock and Carl Luster.

In addition to delivering the ECCC newsletter to Berting Street, Dayton Street, and Gilbert Drive, Maurize will now serve as a central contact point for residents in his neighborhood. Thanks to Mrs. Peacock and her late husband for their years of community service, and thanks to Maurize Rios for volunteering his time and effort.

Sunday, April 11, 2010

Sewer Projects in El Cerrito

The City of San Diego Engineering and Capital Projects Department has distributed information describing 2 sewer and water upgrades in El Cerrito.

Sewer and Water Group 773 Project
One area of the project is located north of El Cajon Boulevard and includes portions of Adams Ave. and Soria Dr. South of El Cajon Blvd., the project includes portions of Estelle St., Adelaide Ave., Meade Ave., and Vale Way. Construction is anticipated to begin in Summer 2010 and will take approximately one year to complete. To read the project description and view the location map, select the link below.

Select the following link for the
Sewer and Water Group 773 Project Description and Location Map.

Sewer and Water Group 780 Project
One area of the project is located north of El Cajon Boulevard and includes Baylor Dr., Austin Dr. Atlanta Dr., Gilbert Dr. and Berting St. Construction is anticipated to begin in July 2011 and will take approximately one year to complete. Notification Letters will be sent to the property owners and the residents one month before the start of construction. To read the project description and view the location map, select the links below.

Select the following link for the
Sewer and Water Group 780 Project Description.

Select the following link for the
Sewer and Water Group 780 Project Location Map.